Skip to content
-
Subscribe to our newsletter and never miss our best posts. Subscribe now!
  • Facebook
  • YouTube
  • Instagram
  • Linkedin
  • X
logo-emesa Emesa M-30
logo-emesa Emesa M-30
  • Facebook
  • YouTube
  • Instagram
  • LinkedIn
  • X
Subscribe
Close

Search

What is the C-Roads project?
Actualidad

What is the C-Roads project?

By Jon Maillo
February 27, 2020 3 Min Read
0

The C-Roads project is a European Union-led initiative, in which Emesa is working together with Madrid Calle 30. It aims to deploy intelligent transport systems (ITS) in the participating countries. It emphasises the need to guarantee the implementation of future transport models in Europe.

Spain’s participation will provide us with the capacity to collaborate in harmonising future European Union measures. In this regard, Spain is delivering five projects that will be implemented across the country.

C – Roads Spain pilot project

Spain has given its full support to the implementation of the C-Roads project by creating five pilot projects, as well as common indicators with specific goals.

DGT 3.0 pilot

This project is based on sharing real-time anonymous data between all participating actors in road use.

Using a platform, drivers and road users will generate data. This data will be uploaded to improve traffic safety and give real-time information on any events that may affect safety.

The end goal of the project, known as Vision Zero , is the elimination of all fatalities on the roads.

The Directorate General of Traffic (DGT) has created a free application called Comobity to assist in the implementation of the project. The application allows users to ascertain the distance between each other and avoid collisions. This will enhance safety on the roads.

Extended SISCOGA pilot

This project is limited to the Vigo metropolitan area and will use ITS G5 technology. It aims to improve road safety and facilitate traffic flow through the combined use of other technologies including LTE and LTE/V.

Specifically, the aim of this test project is to detect in real time slow or stationary vehicles, road works, and set weather conditions, as well as many other situations.

Four autonomous vehicles have been brought in to assist with the pilot which will travel on sections of the motorway between the A55 in Spain and the A27 in Portugal. A total area of 150 km will be covered.

Madrid Pilot

Madrid Calle 30 will coordinate, in conjunction with Emesa, this project which will be located on an approximately 32 km long stretch of the M30.

As in the previous project, transport information system technology will be used. By placing sensors and antennae real time information on traffic conditions will be available : stationary vehicles, traffic warnings, and accident warnings whilst we are travelling on the road. This will deliver a high-quality service and improve road and road user safety.

The pilot project in Madrid will mobilise a fleet of 120 vehicles, including one autonomous vehicle to evaluate the functionality of cooperative transport systems.

Cantabrian pilot

This fourth project will carry out tests related to the risk of crashes on mountainous roads . This part of Spain has been chosen for that reason.

Specifically, the test will be conducted on 75 km of roads in the regions of Galicia, Asturias, and the Basque Country, which are all connected by the A8 at various points.

145 vehicles have been assigned to this project, which will perform tests over a distance of 36 km.

Another goal of this project is to evaluate the utility of the Smart Routing application, which aims to provide information on alternative routes in the event of accidents.

Mediterranean pilot

This is the largest test to be carried out in Spain. It will extend from Catalonia to Andalucía on stretches of the AP7 motorway and the National 340.

As in the previously mentioned projects, two subcategories, named Day 1 and Day 1.5, are included. These have separate goals with a view to future projects:

  • Specifically, this test will collect information from fuelling and charging stations used by electric or alternative fuel vehicles.
  • Another aim is to identify, via the Smart Slip Road service, accidents which may have been caused by the road surface being slippery as a result of weather conditions.

The goal of the C-Roads project is to place new technologies featuring ITS, v2v (vehicle to vehicle) and v2i (vehicle to infrastructure) in charge of making our driving experience safer and more reliable by, as far as possible, removing human error.

Related reading

  • Madrid C-Roads Spain pilot: How will the project work on the M-30?
Author

Jon Maillo

Follow Me
Other Articles
Safety advices for driving in M-30 tunnels
Previous

Safety advices for driving in M-30 tunnels

Madrid C-Roads Spain pilot: How will the project work on the M-30?
Next

Madrid C-Roads Spain pilot: How will the project work on the M-30?

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • When can the reverse manoeuvre be performed?
  • What are the speed limits in Europe?
  • The meaning of road markings
  • How to drive safely through a tunnel
  • Tunnel effect in the car: what is it and how does it affect driving?

Recent Comments

  1. We tell you how to rent an electric car in Madrid on Motosharing: a new way to get around Madrid
  2. The tunnels of the M-30: fun facts and data | Emesa M-30 on Traffic M-30
  3. 5 Steps to reduce fuel consumption | Emesa M-30 on Save fuel by reducing diesel consumption
  4. How to get to the funeral home of the m-30? | Emesa M-30 on San Isidro Funeral Parlour: How to get there from the M-30?
  5. Pollution protocol in Madrid: if you drive, this will on Can you drive and park in Madrid Central on a motorcycle?

Archives

  • October 2026
  • May 2024
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • September 2017
  • July 2016

Categories

  • Actualidad
logo emesa
Sello AENOR ISO 14001 1
Sello AENOR ISO 14001 1
Sello AENOR ISO 14001 1
Sello AENOR ISO 14001 1
Sello AENOR ISO 14001 1
Sello AENOR ISO 50001

Company owned by:

ferrovial logo
acs logo
vinci logo
© Copyright 2026 Emesa M-30. All rights reserved. C/ Méndez Álvaro, 95 (28053) Madrid